Job Details

Technical Director - Hyperscale Data Centre Construction & Development

Technical Director - Hyperscale Data Centre Construction & Development

📍 London
£170,000 per annum
£170000 - £200000/annum Excellent Benefits
Industry: Engineering
Applications: >10
Posted: 17-06-2026
Company: Anderson Wright Consulting
Type: Permanent
Reference: 225259114

Job Description:

Technical Director, Construction – EMEA (Data Centers)

Location: Frankfurt, London, Paris, or other EMEA locations as required

As part of our clients continued expansion across EMEA, they are now seeking an experienced Technical Director, Construction to provide technical leadership across the delivery of hyperscale and mission-critical data center developments.

This is a senior owner-side role responsible for ensuring the successful execution of data center projects from design and pre-construction through construction, commissioning, and operational handover. The successful candidate will serve as the technical authority during construction, working closely with General Contractors, consultants, commissioning teams, and internal stakeholders to ensure projects are delivered safely, efficiently, and in accordance with design intent, quality standards, and operational requirements.

This is a highly site-focused role, with the majority of time spent on active construction sites across EMEA providing hands-on mechanical and electrical technical leadership and oversight.

The candidate MUST have hands on site, ground up experience with the key responsibilities and MUST meet the requirements detailed below.

Key Responsibilities

Requirements

This is an outstanding opportunity to join a rapidly growing organisation at the forefront of digital infrastructure development, delivering some of the most advanced data center projects across the EMEA region.

#DataCenters #Hyperscale #MissionCritical #ConstructionLeadership #TechnicalDirector #MEP #Commissioning #DigitalInfrastructure #OwnerSideConstruction #EMEAJobs

Apply Now